HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What is the difference between application scenarios of pipe racks E2 and E3 according to HG/T21629-2021?

2024-03-14View Original

Thread Content

What is the difference in application scenarios between HG/T21629-2021 pipe racks E2 (guide frames for pipe supports) and E3 (clamped-type guide frames for pipe supports)?
Reply #22024-03-19
It seems that the load has little impact; it’s more the installation space that matters. E2 is suitable for situations with ample installation space, while E3 is more appropriate when the pipe supports are shorter
Reply #32024-03-19
If +Y is vertically upward, E2 cannot constrain the +Y direction, whereas E3 can constrain the X and Y directions.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.