Thread Content
Recently, the weather has become colder, and the lowest temperature has dropped to below zero. The Olefin Center organized in a timely manner, formulated preventive measures in advance, carried out special anti-freeze inspections on all key equipment and key process pipelines, and used heat tracing on some process pipelines according to actual needs to ensure that each unit survives the winter safely and smoothly. Each device must further improve the anti-freeze and anti-condensation treatment measures and emergency plans based on the actual production operation conditions. At the same time, relevant managers are required to conduct on-site anti-freeze and anti-condensation inspections, comprehensively implement insulation measures for key equipment and various instruments, and at the same time, the production operations that need to be carried out in the near future must also be included in the key winter anti-freeze and anti-condensation control scope. It is clearly required that anti-freeze and anti-condensation work should be arranged in place and responsible for each device. Managers and operators should strengthen inspections and effectively protect equipment that may be affected by freezing to ensure "early detection and early treatment", nip hidden dangers in the bud, and ensure safe and stable winter production.
Autumn is here again, the antifreeze maintenance equipment is running smoothly and it is not a cold bird.
Yes, we do need to take precautions against freezing in winter in the north.
Refineries in the south do not need to consider this issue.