Issues related to flanged valves for pipes in Series 2 of GB/T17395-2008

2018-11-24View Original

Thread Content

For pipe flanged valves in Series 2 of GB/T17395-2008, which standard should be used? Pipes in Series 1 can generally be matched with GB or HG flange standards. But for the pipes in series two, no suitable flanges can be found. For example, for a pipe with an outer diameter of 63 (63.5), when used with a DN50 flange according to HG20592, the corresponding pipes of series A have an outer diameter of 60.3, while those of series B have an outer diameter of 57. It’s even more impossible to use a DN65 pipe in this context. Which standard and which series of valves and flanges should be chosen for this application?
Reply #22018-11-24
Use HG flanges to create custom-made versions!
Reply #32018-11-24
This is a standard for pipes, and I think it isn’t applicable to all pipe sizes; some may not fall within the commonly used specifications for pipes, which makes it difficult to find suitable flanges. If you provide the specific flange dimensions, it will be easier to determine what’s appropriate
Reply #42018-11-25
Thank you. We can only manufacture custom flanges, but it’s difficult to find matching custom valves. I’m thinking of using a 63-76 reducer, with DN65 flanges and valves, as that might result in lower costs
Reply #52018-11-25
When designing pipes, the pipe diameter should be selected in accordance with pipeline specifications to facilitate piping work; I’m not sure why you chose that diameter in the first place.
Reply #62018-11-25
Yes, make a reducer; it’s best to use common types of flanges and valves so that they can be replaced and maintained easily in the future
Reply #72018-11-25
The user has already purchased the pipes in advance. And it cannot be replaced
Reply #82018-11-25
Well, :lol :lol :lol :lol :lol :lol :lol :lol
Reply #92018-11-26
Weren’t you the one who designed the drawings? Let the user decide on their own?
Reply #102018-12-02
This is the normal process, but they bought the pipes in advance based on the old pipelines used before

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.