HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Which standards should be followed for the excavation and backfilling of trenches for industrial metal pipes?

2019-05-16View Original

Thread Content

Which standards should be followed for the excavation and backfilling of trenches for industrial metal pipes? The GB 50235 Code for Construction of Industrial Metal Pipe Projects does not contain any provisions regarding the excavation and backfilling of trenches. Since the pipes in my case need to be buried underground, relevant standards must be applied; which ones should be followed?
Reply #22019-05-16
I’m not quite sure about this. What I’ve seen is that they lay the pipes beside the piled soil, push the soil into ditches and level it out, and then pave it with asphalt

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.