HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

In the maintenance quotas, what is the difference between using standards for gasket replacement and those for flange disassembly and assembly?

2019-05-27View Original

Thread Content

A beginner seeking advice: in the maintenance quotas, what is the difference between using the procedure for replacing gaskets on flanges and the procedure for assembling and disassembling flanges? It seems like there’s disassembly, assembly, and replacement of pads involved
Reply #22019-11-11
When removing a flange, apply a coefficient of 0.5 to the flange installation cost.
Reply #32019-11-12
There are two different procedures: replacing the gasket involves simply removing the bolts, or loosening the bolts to create space for replacing the gasket. Whereas removing the flange requires removing the bolts and taking the flange apart as well

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.