HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How to fix the cutting of DN400 at a high position

2019-10-28View Original

Thread Content

How should the DN400 pipe on the ductwork be secured to prevent it from falling on one side? Should temporary supports be added? What type would be suitable?
Reply #22019-10-28
To put it clearly, just pipe cutting?
Reply #32019-10-28
There is a place for hanging it; it’s better to use a hand chain hoist; There is a space for support below; it’s better to use wooden blocks or steel sections as padding. Insufficient information; I don’t know.
Reply #42019-10-29
The pipeline crosses the middle of the two pipe supports as the cutting point. The cut pipelines in the top pipe gallery are lifted away using a crane, while those in the middle layer of the pipe gallery are moved out of the gallery using winches before being lifted down with a crane.
Reply #52019-10-29
Please describe the problem in detail; it would be helpful to have photos or sketches so that everyone can discuss it more effectively. More participation is welcome

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.