Questions regarding the calculation of reinforcement strength

2022-04-03View Original

Thread Content

According to GB/T20801-2020, for a steam pipeline at 3.8 MPa and 385 degrees, the reinforcement area for DN400 is (406.4*17.5); since a direct opening of DN25 is present, reinforcement is required. For DN65, with an opening of DN25, no reinforcement is needed. Why is this?
Reply #22022-04-06
Wait for the big shot {:1_90:}
Reply #32022-04-06
When welding a DN25 branch pipe to a DN65 main pipe, reinforcement calculations are required. The standard you’re referring to says that no calculation is needed, right? Please provide it.
Reply #42022-04-13
No, I mean my calculations show that the reinforcement area is sufficient; no additional reinforcement measures are needed. . I’m asking why larger pipes need reinforcement while smaller ones don’t; there seems to be a difference when it comes to straight pipes
Reply #52022-04-14
It’s not the case that only large pipes need reinforcement while small pipes don’t; the requirement depends on whether there are openings, and calculations must be done first before a decision can be made.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.