HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Relationship between elevation and layout sequence

2010-06-30View Original

Thread Content

When drawings at different elevations are placed on the same sheet, what is the most reasonable order for arranging them? ! Hehe
Reply #22010-07-01
The original poster’s question isn’t very clear. Let me start with my personal opinion. When planning the layout of equipment, it is usually done in layers; in areas with frames or platforms, the drawings are prepared starting from the lowest layer, such as the +0.000 level, up to the +5.000 level. If so, the separation surface can be selected for description in accordance with the pipeline layout requirements.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.