Regarding the factory building issue!

2017-04-30View Original

Thread Content

This is a project with a capacity of 100,000 tons; currently, 5 electrolyzers are located at the front, and there is a transformer with a capacity of 110,000 tons behind them. The control room is in the middle, with all the copper bars running beneath it. The control room is within 20 meters of both the electrolyzers and the transformers. Moreover, there are no iron plates or steel sheets in the walls of the control room; they are just ordinary brick walls. Is the radiation level high in this case? I’m not sure if there are any relevant standards or materials available to consult
Reply #22017-04-30
The safety distance does not meet the requirements; is there a design institute for this project?
Reply #32017-04-30
When I asked the manager, they were vague and only said it met the requirements. It’s a relocation project; the previous factory buildings had steel plates in the partition walls, but not anymore
Reply #42017-05-01
What is designed by the design institute will definitely meet the requirements.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.