HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Instrument selection issues

2017-10-12View Original

Thread Content

Our factory is a newly established small facility; the first phase has already been put into operation while the second phase is under construction. We are now need to select instruments for the utility systems, such as those for water, wastewater, compressed air, steam, chlorine, chilled water, etc. It is necessary to handle the accounting for the utility systems in Phase 1 and Phase 2 separately – one set of instruments for Phase 1 and another set for Phase 2. The instrumentation for Phase 1 was supplied and installed by a third party; now we need to handle the utility system for Phase 2 on our own. Please share your suggestions regarding the selection of instruments and your experience with them. For Phase 1, the instruments used were electromagnetic flowmeters, wedge flowmeters, vortex flowmeters
Reply #22017-10-13
The choice of type depends on the process conditions, as different types are suited to various operating conditions and precision requirements.
Reply #32018-04-03
Choose the appropriate instruments based on the process conditions, and decide on which brand to select considering the investment costs. You can contact me on QQ at 1406583624 to discuss this further

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.