Thread Content
The 300,000-ton caustic soda production facility in Henan Jinhai has begun trial operations. The billion-yuan-scale fluorosilicon new materials project in Luohe, Henan, is located in the Economic and Technological Development Zone of Wuyang County, Luohe City; the total area covered by this project is approximately 3,000 mu, with a total investment of 30 billion yuan. On July 11, 2024, the groundbreaking ceremony for Jinhai New Materials’ fluorosilicon materials project worth hundreds of millions was held. The project is constructed in two phases; the first phase requires an investment of 15.8 billion yuan and includes a production capacity of 300,000 tons of caustic soda, along with facilities for the production of chloromethanes.
【Ten Years of Rapid Development in Chemical Equipment】3034–2026: The world’s first fixed-bed copper-based catalyst process; East China University of Science and Technology, in collaboration with chlor-alkali manufacturers, overcomes the challenge of recycling hydrogen chloride as a by-product. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715177 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Haichuan Equipment Guessing Game】Wasps’ nests growing on pipes? ? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715340 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711616 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
【Common Issues in Haichuan Pipeline Design】--Calculation of Fluid Conveyance Pipelines https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715465 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2037 to 2026: China’s first independently designed and built large-scale integrated fracturing engineering vessel, the “Ocean Oil 696”, was delivered in Zhoushan, Zhejiang. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715229 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】3038=2026: Shandong Energy’s independently developed aldehyde-based fragrance project fills a technical gap in China, reducing reliance on imports! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715785 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
A true classic! ! ! The elbows subjected to prolonged liquid flow really take your breath away! ! ! ! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714477 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】China’s first 20,000-ton wet-process masterbatch production line was put into operation at Hei Mao in Jiangxi from 2039 to 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715864 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2034 to 2026: Beijing Aerospace Power Research Institute’s first large-scale TO+RTO combustion unit designed independently began operating at full capacity successfully. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716014 (Source: Haichuan Chemical Industry Forum (HCBBS))