HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Overflow problem in the chlorine drying tower

2020-11-02View Original

Thread Content

Gentlemen, our company currently uses a process that involves 2 packed towers and 1 bubble column for chlorine drying. It has been observed that in winter, the liquid from the bubble column can flow over to the second packed tower and then to the first packed tower, but this does not happen in summer. Logically, in summer the temperature is high, the viscosity of sulfuric acid is low, and the resistance is small, so it should be easier for overflow to occur. Then why is the resistance even greater in summer?
Reply #22020-11-04
Was it built new or has it been in use for many years? Does the same problem occur every year? Generally, such problems occur only when the pipeline is blocked

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.