HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Is it necessary to connect an anti-static bonding wire to the sewage pipeline of the main acetylene pipeline on site?

2022-03-27View Original

Thread Content

This post was last edited by Desert Fish on 2022-3-27 at 20:01. Is it necessary to connect an anti-static jumper to the sewage pipeline of the main acetylene pipeline on site? The sewage pipeline drawn later?
Reply #22022-03-27
It should be necessary; there are combustible materials available, and it doesn’t cost anything
Reply #32022-05-06
If there is a possibility of acetylene emissions, the level of danger is quite high. It’s necessary to follow safety regulations strictly and avoid any problems; otherwise, things might not seem too serious. But with acetylene, any incident can lead to serious consequences, and it may also affect the pipelines and equipment upstream.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.