HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Personnel allocation for acid storage areas and acid handling zones

2017-01-09View Original

Thread Content

For a project with an annual production capacity of 380,000 tons of sulfuric acid, how many staff members are needed for the acid storage area and the area where sulfuric acid is loaded, and what is the allocation for each? The acid storage area is more than 300 meters away from the sulfuric acid control room; is it necessary to have dedicated personnel on duty for inspections during the night shift?
Reply #22017-01-09
It depends on the number of your storage tanks and loading/unloading stations; we, together with those who use dry suction, need 3 people in total
Reply #32017-01-09
4 storage tanks of 10,000 tons each, and 8 acid loading sumps of 80 tons each.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.