HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Sinopec obtains a patent for a method of processing heavy oil

2025-08-12View Original

Thread Content

According to news from August 12, 2025, **information from the Intellectual Property Office shows that Sinopec Corporation and Sinopec Research Institute of Petroleum Chemistry have obtained a patent titled “Method for processing heavy oil,” with the approval announcement number CN117946745B; the application was filed in October 2022. According to Tianyancha data, China Petroleum & Chemical Corporation was established in 2000 and is headquartered in Beijing. It is a company primarily engaged in the oil and natural gas extraction industry. The registered capital of the enterprise is 121,739,689.893 million RMB. According to the big data analysis conducted by Tianyancha, Sinopec Corporation has invested in 263 companies in total, participated in 5,000 bidding projects. In terms of property-related information, there are 45 trademark records and 5,000 patent records; additionally, the company holds 40 administrative licenses. Sinopec Petrochemical Research Institute Co., Ltd., established in 2022 and located in Beijing, is a company focused on research and experimental development. The registered capital of the company is 300 million RMB. According to the big data analysis provided by Tianyancha, Sinopec Research Institute of Petroleum Chemistry Co., Ltd. has made investments in 2 companies, participated in 1,815 bidding projects, and holds 1,313 patent records. In addition, the company possesses 292 administrative licenses.
Reply #22025-08-12
【Ten Years of Rapid Development in Chemical Equipment】Global largest acetic acid production plant of its kind will come online in Hami from 2026 to 2025 https://bbs.hcbbs.com/thread-5698566-1-1.html (Source: Haichuan Chemical Forum)
Reply #32025-08-12
【Ten Years of Rapid Development in Chemical Equipment】Global largest acetic acid production plant of its kind will come online in Hami from 2026 to 2025 https://bbs.hcbbs.com/thread-5698566-1-1.html (Source: Haichuan Chemical Forum)
Reply #42025-08-12
【Ten Years of Rapid Development in Chemical Equipment】From 2001 to 2025, the bypass valve for the central tube of the waste heat recovery unit in ammonia synthesis plants, developed under the leadership of Ningxia Petrochemical, was successfully manufactured domestically. https://bbs.hcbbs.com/thread-5698562-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-08-13
【Ten Years of Rapid Development in Chemical Equipment】China’s first hydrogen production project using pressure swing adsorption (PSA) technology for coke oven gas was successfully put into operation from 2023 to 2025. https://bbs.hcbbs.com/thread-5698597-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-08-13
【Ten Years of Rapid Development in Chemical Equipment】2606-2025: A first in China! Completion of the system integration for the first batch of intelligent welding robots for flexible manufacturing in offshore engineering projects https://bbs.hcbbs.com/thread-5698619-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-08-15
【History of Haichuan Chemical】Xu Jinqiang, the founder of China’s petroleum industry https://bbs.hcbbs.com/thread-5698739-1-1.html (Source: Haichuan Chemical Forum)
Reply #82025-08-15
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2614 to 2025: ANGANG Group’s AG785 spherical tank steel, with a strength of 785 MPa and high toughness and pressure resistance, was introduced globally for use in deep-sea containers. https://bbs.hcbbs.com/thread-5698753-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-08-15
【Ten Years of Rapid Development in Chemical Processing Equipment】The total weight of the 25-8 project in Huizhou, spanning the period from 2615 to 2025, is approximately 14,370 tons; the DPPB module was shipped from Qingdao, Shandong. https://bbs.hcbbs.com/thread-5698754-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-08-16
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2016 to 2025, Tianhua Institute independently developed 8 heat box systems, which were successfully deployed in ExxonMobil’s 500,000 tons per year low-density polyethylene (LDPE) production facility. https://bbs.hcbbs.com/thread-5698775-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #112025-08-16
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2017 to 2025: Overcoming key technical challenges; China’s first thousand-ton capacity high-performance carbon fiber production line was built in Datong, Shanxi. https://bbs.hcbbs.com/thread-5698780-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.