HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

[Quality Version] Daily Question for 20171219

2017-12-19View Original

Thread Content

The construction contractor must carry out work in accordance with ( ) and the construction technical standards; it is not allowed to modify the engineering design without authorization, nor to cut corners. A. Construction drawing set B. Engineering design drawings C. Construction plan D. Construction quality standards Correct answer: B

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.