HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

[Civil Engineering Version] Daily Question 20180406

2018-04-06View Original

Thread Content

In wall covering work, after installation, the various panels should be aligned horizontally and vertically; the patterns on the joints should match so that no seams are visible. The inspection of the seams should be carried out at a distance of (  ) from the wall, viewed head-on.   a、1.0m   b、1.2m   c、1.5m   d、2.0m Answer: c
Reply #22018-04-06
In wall covering work, after installation, the various panels should be aligned horizontally and vertically; the patterns on the joints should match so that no seams are visible. The inspection of the seams should be carried out by looking straight at them at a distance of ( C ) from the wall.   a、1.0m   b、1.2m   c、1.5m   d、2.0m

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.