When determining the route of the main pipes, their direction of extension should be consistent with the flow direction of water delivered by the secondary pumping stations to pools, water towers, and large consumers. One or several main pipes should be laid parallel to each other in areas with high water consumption, at the shortest possible distance. The spacing between parallel main pipes is approximately () m. a、100~300 b、300~500 c、500~800 d、800~1000 Answer: c

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.