Thread Content
The hoisting of the first and second reactors for the 1# SAN synthesis framework of the Zhejiang Jintang ABS project has been successfully completed. Each of the two core reactors weighs 50 tons, has a lifting height of 32 meters, and requires high precision during installation. The project team, in collaboration with various parties, developed a specialized lifting plan to overcome challenges such as limited space at the site and high-altitude operations; by using two machines working together, along with continuous monitoring and precise control, the installation was completed in one go. This lifting marks the full entry of the project into the equipment installation and pipeline preparation phase, laying a solid foundation for subsequent process integration and capacity activation.
【Ten Years of Rapid Development in Chemical Equipment】2747-2025: Jiangxi Lexing’s first domestic production line for the advanced processing of anhydrous fluoro gypsum is set to go into operation https://bbs.hcbbs.com/thread-5703082-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Equipment】2749–2025: China’s largest-scale cracking gas valves in the world – The 60-inch ultra-large diameter cracking gas valves used at Tianjin Nangang Ethylene Plant have passed industrial application tests. https://bbs.hcbbs.com/thread-5703102-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 2751-2025 Three Gorges Group project for the development and application demonstration of large-scale compressed air energy storage systems and related key equipment has successfully connected to the power grid for electricity generation. https://bbs.hcbbs.com/thread-5703150-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 3000HP five-cylinder pump intelligent operation and maintenance system, independently developed by Lanshi Equipment Company, was completed and tested between 2025 and 2752. https://bbs.hcbbs.com/thread-5703151-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Great Development in Chemical Engineering Equipment】Sinopec’s independently developed intelligent assistance system for evaluating defects in pipeline circumferential weld radiographic inspections, 2754–2025, has completed accuracy tests. https://bbs.hcbbs.com/thread-5703159-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The intelligent pipeline inspection model for petroleum pipelines in China, developed between 2025 and 2755, has been successfully created and put into use. https://bbs.hcbbs.com/thread-5703160-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2017 to 2024, CNPC Pipeline Bureau made breakthroughs in key technologies for flexible welding robots in mountainous areas! https://bbs.hcbbs.com/thread-5703164-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2017 to 2024, CNPC Pipeline Bureau made breakthroughs in key technologies for flexible welding robots in mountainous areas! https://bbs.hcbbs.com/thread-5703164-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】Major breakthroughs achieved in the development of metallocene catalysts at the Jilin Petrochemical Research Institute of Sinopec from 2025 to 2759 https://bbs.hcbbs.com/thread-5703175-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2760-2025: Shaanxi Electronics successfully developed the world’s first intelligent unmanned fire truck https://bbs.hcbbs.com/thread-5703200-1-1.html (Source: Haichuan Chemical Industry Forum)