【Daily Question】Utilities - Water Supply and Drainage - 20190220

2019-02-20View Original

Thread Content

The elevation of the terrain at point A and point B is 62.0 m and 61.5 m respectively. If the head loss in the pipe segment AB at a certain flow rate is 1.5 m, and the service head at point B is 20 m, then the service head at point A is ( ). a, 20mb, 21mc, 21.5md, 23m Answer: b. The node water pressure is the sum of the ground elevation at that node and the service head at that point; therefore, the water pressure HB at the end of the pipe section B is 61.5 + 20 = 81.5 m. The pressure difference between the start and end of the pipe section is equal to the head loss from the start to the end of that section, that is, HA-HB=hA-B. Therefore, the node water pressure at point A is HA = HB + hA – B = 81.5 + 1.5 = 83 m.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.