HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Question】Utilities - Water Supply and Drainage - 20190703

2019-07-03View Original

Thread Content

This post was last edited by hesonchang214 on 2019-7-6 at 11:37. In a circular pipe network, when the directions of the closure errors of adjacent fundamental loops are the same, it is advisable to (), which can accelerate the adjustment process. A. Combine them into a large-loop adjustment B. Perform adjustment for each loop individually C. Select the loop with the largest closure error for adjustment D. Connect them into virtual loops for adjustment Answer: A
Reply #22019-07-03
A. Combine them into a large-circle adjustment

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.