HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Discussion】Utilities - BIM - 20210424

2021-04-25View Original

Thread Content

Multiple choice: Which of the following statements are correct? ( ) The design phase is the stage where the requirements from the planning and scheduling stages are transformed into a physical description of the facility. The construction phase is the stage at which this physical description of the facility becomes a reality. The main outputs of the construction phase are the construction drawings and detailed specifications. Commissioning is a systematic process aimed at ensuring that all systems and components can perform their functions as specified in the details, in accordance with the requirements of end-users and the operational needs of the owner. Answers: AD. Feel free to participate actively in the discussions; there are great rewards available for those who answer questions posed by VIP members! ! !
Reply #22021-04-25
A D? ?? ???

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.