HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Discussion】Utilities - BIM - 20210608

2021-06-08View Original

Thread Content

Which of the following options correctly explains the application of BIM in projects? ( ) A. BIM refers to 3D models. B. Once 3D models are available, there is no need for 2D drawings. C. Even with 3D models, 2D drawings are still necessary. D. 5D construction simulation is used during the design phase. Answer: C. Feel free to participate actively in the discussions; the system offers generous rewards for answering questions posed by VIP members! ! !
Reply #22021-06-08
After having a 3D model, 2D drawings are still needed as well

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.