HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

whhh

2024-01-31View Original

Thread Content

This post was last edited by Esy on 2024-5-31 23:31 ddk
Reply #22024-01-31
"\"15min\" usually refers to a time duration of 15 minutes. In the context of chillers, this may refer to a set time for the machine to operate, freeze, or be maintained. The specific meaning needs to be determined by referring to the operating instructions of the chilled water pump or the context. .
Reply #32024-02-03
Here, after the Dunham Bush chillers are shut down, they need to be restarted; there must be a 15-minute interval before they can be turned on again

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.