Thread Content
The installation project for the 50,000 Nm³/h air separation cryogenic tank and storage tanks at Mexico’s Cryoinfra company, undertaken by China National Chemical Sixth Construction Engineering Company Wuhan Branch, has recently achieved significant progress. The second band plate of the cryogenic tank, the lower section of the main tower, and the lower section of the crude argon tower have been successfully lifted into place. Meanwhile, the installation of the bottom plates for 1 7000 m³ atmospheric pressure liquid oxygen storage tank and 1 3500 m³ atmospheric pressure liquid nitrogen storage tank has also been completed. This project was developed specifically for Mexico’s largest domestic gas company, focusing on the production and distribution of industrial gases, with a stable supply of key gases such as oxygen, nitrogen, hydrogen, argon, and carbon dioxide. Once completed, the project will effectively fill the gap in domestic gas supply in Mexico, reduce operational costs for businesses, create local jobs, and enhance the resilience of industrial supply chains, thereby providing a strong boost to Mexico’s industrial upgrading and economic development.
【HaiChuan Overseas Engineering】30% model of the FEED phase for the first phase of the Luwuma LNG project in Mozambique has passed the owner’s review https://bbs.hcbbs.com/thread-5703759-1-1.html (Source: HaiChuan Chemical Forum)
【Haichuan Overseas Engineering】The world’s first! Preparatory meeting for the foundation engineering design of Kenya’s 480,000 tons/year green fertilizer and associated geothermal power plant project – https://bbs.hcbbs.com/thread-5703706-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2765 to 2025: CGN Group’s technology for the utilization of high-salinity unconventional water resources recognized as internationally leading https://bbs.hcbbs.com/thread-5703353-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first **-class deep-sea oil and gas emergency rescue base was put into use in Hainan from 2767 to 2025 https://bbs.hcbbs.com/thread-5703425-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】The world’s first production facility capable of manufacturing thousand-ton quantities of rubidium and cesium salts has reached full capacity at the Anyi County production site of Jiangxi Jinde Lithium New Energy, 2768-2025. https://bbs.hcbbs.com/thread-5703443-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Equipment】China National Petroleum’s First PO/SM Plant Successfully Commissioned in 2025 https://bbs.hcbbs.com/thread-5703514-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2771-2025: The helium cryocooler with the highest cooling capacity currently in use in China’s fusion field is operating stably. https://bbs.hcbbs.com/thread-5703623-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest φ530 Assel skew rolling tube production line, independently developed by Tai Chong, was officially put into operation in 2025. https://bbs.hcbbs.com/thread-5703638-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2771-2025: The helium cryocooler with the highest cooling capacity currently in use in China’s fusion field is operating stably. https://bbs.hcbbs.com/thread-5703623-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】2773-2025: HydroMorning Technology unveils the world’s first offshore 1,000-square-meter PEM electrolyzer and hydrogen production system https://bbs.hcbbs.com/thread-5703646-1-1.html (Source: Haichuan Chemical Industry Forum)