HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Oman OQ initiates FEED tender for Saih Nihayda natural gas liquids project to create an integrated NGL value chain

2026-03-05View Original

Thread Content

OQ Oman has issued a Front-End Engineering Design (FEED) tender for the Saih Nihayda natural gas liquids project, aiming to establish an integrated NGL value chain. The OQ Group in Oman has launched this FEED tender for the Saih Nihayda natural gas liquids (NGL) extraction facility. The project has a maximum processing capacity of 48 million cubic meters per day. It is a crucial strategic initiative for strengthening Oman’s energy industry ecosystem and increasing the added value of natural gas. The project will strengthen the regional natural gas supply chain and support Oman’s industrial diversification development plan. The new facility will create a complete integrated NGL value chain, linking upstream extraction at Saih Nihayda with the processing, distillation, storage, and export infrastructure in the Doukoum Special Economic Zone (SEZAD). The project includes the construction of a dedicated 230-kilometer, 16-inch gas pipeline, as well as a downstream fractionation complex in Duqm for separating key gas components. The products will include ethane, propane, butane, and C5+ condensates, which can be supplied for use in the petrochemical and manufacturing industries in Oman and regional markets. The ethane extracted by the facility is expected to serve as a key raw material for the proposed Oman Petrochemical Complex in Duqm, making the project a crucial infrastructure for **industrial upgrading.
Reply #22026-03-05
【Ten Years of Great Development in Chemical Engineering Equipment】 From 3029 to 2026, the thermal oil furnace with the largest single-unit load at Beijing Aerospace Propulsion Institute was successfully commissioned. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714661 (Source: Haichuan Chemical Engineering Forum (Huahai Chuanliu hcbbs))
Reply #32026-03-05
[3D Process Flow] Compilation post -- Aromatic hydrocarbon industry chain https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714701 (Source: Haichuan Chemical Forum (HCBBS))
Reply #42026-03-06
【Ten Years of Great Development in Chemical Engineering Equipment】 From 3029 to 2026, the thermal oil furnace with the largest single-unit load at Beijing Aerospace Propulsion Institute was successfully commissioned. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714661 (Source: Haichuan Chemical Engineering Forum (Huahai Chuanliu hcbbs))
Reply #52026-03-06
A true classic! ! ! The elbows subjected to prolonged liquid erosion will truly open your eyes! ! ! ! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714477 (Source: Haichuan Chemical Engineering Forum (Huahai Chuanliu HCBBS))
Reply #62026-03-06
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #72026-03-07
[Haichuan Equipment Quiz] Only those specializing in instrumentation would know what kind of valve this is. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714852 (Source: Haichuan Chemical Engineering Forum (Huahai Chuanliu hcbbs))
Reply #82026-03-07
【Haichuan Equipment Guessing Game】It has no top and no bottom! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714846 (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #92026-03-08
[Haichuan Safety Forum] Hidden dangers around us – In the industrial tank farm, the clear height above the circular fire access road is less than 5 meters. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714863 (Source: Haichuan Chemical Engineering Forum (Huahai Chuanliu HCBBS))
Reply #102026-03-08
[Haichuan Equipment Guess Game] Determining weight of objects from a distance https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714890 (Source: Haichuan Chemical Forum (Huahai Chuanliu HCBBS))
Reply #112026-03-09
【Ten Years of Rapid Development in Chemical Equipment】3031-2026: The Largest in Asia! China’s independently designed cylindrical \"offshore oil and gas plant\" is under construction in Qingdao https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714904 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.