This post was last edited by liaifeng on 2020-6-25 at 22:29. On June 24th, at the construction site of Zhejiang Petrochemical’s 2# 1.4 million tons/year ethylene plant, Zhejiang Petrochemical and Huisheng Engineering – the general contractor responsible for building the second phase of this ethylene plant – organized a \"Campaign to Meet the 830 Goal: Mobilization Meeting for the Labor Competition.\" The 5,000 workers involved pledged to work together to create high-quality projects and provide safe and excellent services to Zhejiang Petrochemical. 207
It has only been a year, and the second phase of Zhejiang Petrochemical has already reached such a scale – the construction pace is truly fast. Restart of Zhejiang Petrochemical’s Phase II ethylene plant https://bbs.hcbbs.com/thread-2716073-1-1.html (Source: Huahai Chuanliu – Haichuan Chemical Forum Website)
If it is a video file, it’s more appropriate to use the “Upload Video” option in the toolbar! :victory: Thank you for sharing, wise one!
It’s my first time uploading a video, so I’m not very familiar with how to do it.
I agree with you; for an ethylene plant with a capacity of 1.4 million tons per year, if the construction is to be completed within 14 months as specified in clause 830, this pace is probably unmatched at the moment.
With experience from the first phase, one must race against time in the second phase. The sooner it’s built, the sooner money can be earned; the interest on loans alone is very high.
Hui Cheng has become the general contractor for ethylene production
Is the second phase also overall modular in terms of the cracking furnace design from the first phase?
It has an exactly identical modular structure, so it’s fast.