HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Current capacity and production volume of Shandong Korul acrylonitrile plant

2022-11-21View Original

Thread Content

Before 2019, I recall that Korur had an acrylonitrile production facility with a capacity of 130,000 tons; a second phase was built later with a capacity of 260,000 tons. Is the total capacity currently 260,000 tons? The total production capacity still reaches 390,000 tons. Does anyone know what the actual output is?
Reply #22023-01-13
19 years ago, Corull’s production capacity was 130,000 tons per year; the equipment in Phase 2 shared the post-treatment facilities with those in Phase 1, a configuration commonly referred to as \"two heads and one tail\". In other words, it consists of two sets of acrylonitrile production units with a capacity of 130,000 tons each; the current total production capacity is 260,000 tons per year

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.