Operation problems of ethylene plants

2020-04-23View Original

Thread Content

Why is no standby unit installed for the ethylene tri-machine? Is it not cost-effective to have a backup unit, compared to the losses caused by downtime due to each failure? Who can analyze it?
Reply #22020-04-24
1. When planning the project initiation, the boss didn’t take this into consideration. 2 Cost control 3 Insufficient building area 4 Others
Reply #32020-04-24
The profile of the Haiyou on the upper floor is really good! Let me add something else... Shutting down or starting up large-scale units is not a trivial matter; it’s not as simple as switching machine pumps – it’s a rather systematic process!
Reply #42020-04-24
Where are the devices with three backup units each?
Reply #52020-04-25
There is no reason for the three ethylene units not to be equipped with backup units, nor is any reason needed; there has never been any precedent for not providing such backup units. This is because it is constrained by various factors such as investment, land use, piping, oil circuits, leaks, maintenance, operation, instrument control, and so on. As mentioned on the third floor, the procedures and steps for switching to a backup machine and restarting the main machine are exactly the same; therefore, setting up a backup machine is unnecessary. Investing in a large set of power generation units requires a significant amount of money, and no one has that much money just lying around.
Reply #62020-04-25
The selection and design of conventional ethylene tri-machine systems are already very mature approaches. Moreover, today’s compressors can operate stably and continuously for long periods of time, with no issues arising even over two years. On top of that, the inclusion of backup units increases the risk of leaks as well as the economic costs associated with regular maintenance
Reply #72020-04-26
This is a systems engineering project......
Reply #82020-04-27
This question was raised many years ago, and it’s simply impossible to achieve. Those who have experience in production know that it’s not as simple as just installing a backup pump~
Reply #92020-04-28
What they say is quite professional; to put it in simpler terms, for example, if you want to start up a turbine and a compressor, from the preparation work to starting them up and making adjustments, it takes some time. If there’s a problem with the machine that’s in operation, starting up the backup unit and stopping the operating unit before restarting it takes just as long.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.