HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Turbine alignment

2020-06-05View Original

Thread Content

Alignment should be carried out based on the technical data provided by the manufacturer during installation, without relying on any technical standards suggested by experts; the technical parameters vary from one device to another. Why don’t you take readings while the equipment is shut down?
Reply #22020-06-05
When installing and aligning, just follow the drawings and instructions
Reply #32020-06-05
The data for the morning and afternoon are also inconsistent
Reply #42020-06-17
Compare with the data before disassembly, referring to the technical standards provided by the manufacturer
Reply #52020-06-22
Refer to the manufacturer’s instructions, which are usually very detailed. Also, temperature changes have a significant impact

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.