Thread Content
This post was last edited by Desert Fish on 2024-3-27 at 07:59. 2024: A time of blooming flowers and joy on the forum **********************【Ten Years of Progress in Chemical Processing Equipment】A continuously updated summary thread – feel free to join the discussions: https://bbs.hcbbs.com/thread-3576046-1-1.html (Source: Haichuan Chemical Engineering Forum) ***************** Recently, Sinopec Engineering Co., Ltd. (SEI) held a meeting at the 711th Research Institute of China State Shipbuilding Corporation to launch the development of domestically produced expansion-recompression units for methane tail gases in ethylene plants with an annual capacity of 1 million tons, as well as to discuss the preliminary technical plans; this marks the official start of this project aimed at achieving domestic production of such equipment. This is the sixth localization project carried out by 711 Institute in collaboration with Sinopec. This product project has been included in Sinopec’s plan for the domestic development of key equipment. The task of technology development is carried out jointly by Sinopec Engineering Construction Co., Ltd., Sinopec Maoming Branch, and Institute 711, with implementation relying on the Maoming Ethylene Project; full commercial application is expected to take place by 2025.
【Ten Years of Rapid Development in Chemical Engineering Equipment】1524–2024: Filling a Gap – Domestic large-scale reciprocating units for coalbed methane applications https://bbs.hcbbs.com/thread-5658925-1-1.html (Source: 【Haichuan Chemical Engineering Forum】– Haichuan Network– Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】1525–2024: China’s Creation of the World’s First 100 kW AEM Electrolyzer https://bbs.hcbbs.com/thread-5658948-1-1.html (Source: [Haichuan Chemical Forum] – Haichuan Network – Chemical Industry Forum)
2024: A time of blooming flowers and joy on the Happy Forum