The main steam pipes and high-temperature reheat steam pipes of the newly built power plant boiler cannot be press-tested!

2017-03-15View Original

Thread Content

For newly installed power plant boilers, neither the main steam pipes nor the high-temperature reheat steam pipes can be pressurized for testing; instead, 100% flaw detection is carried out. The reason is that it is not possible to install blind flanges at the turbine cylinders. So, for existing boilers, how are these pipes isolated during hydrostatic testing after major repairs?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.