HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Welding of the anchoring components for the anchor tank?

2017-05-05View Original

Thread Content

GB50341 states that \"the anchoring components shall be welded to the tank wall before the tank is filled with water and before pressure is applied to the water surface.\" What is the reason for this? What are the disadvantages of welding empty cans?
Reply #22024-06-03
The main consideration is the settlement of the storage tank foundation.
Reply #32024-06-04
A long time ago, there was a post in the forum with pictures. It’s a storage tank equipped with anchor bolts; anchor bolt seats were welded in advance, and a water filling test was conducted after the bolts were tightened. As a result, the welds at the anchor bolt seats cracked. Once, it took a long time to find that part, and it really should have been kept as a record

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.