HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Supervision and inspection for pressure vessel manufacturing

2017-11-29View Original

Thread Content

This post was last edited by Hqy_PDYC on 2017-11-29 at 18:01. If the pressure vessel is manufactured on-site, and the company that handles sheet metal processing is different from the company responsible for on-site welding and installation, then will the local pressure vessel inspection agency supervise and inspect the sheet metal work? ?
Reply #22017-12-01
Specifically, check whether there are welds in the tube sections, refer to TSG 21-2016 6.1.2.1.
Reply #32017-12-01
Individual sheet metal rolls do not require a manufacturing license, nor are they subject to inspection.
Reply #42017-12-01
How is it possible to use two different organizations for this? If that’s the case, how can a certificate be issued? The quality control department of the welding company needs to check the dimensions and apply a stamp (for carbon steel products). Such work is very troublesome; it’s better to let them make a statement.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.