HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

In the 75T circulating fluidized bed boiler, the flue brick wall at the upper part of the superheater keeps bulging; it needs to be repaired every year. What is the reason for this?

2017-05-28View Original

Thread Content

In the 75T circulating fluidized bed boiler, the flue brick wall at the upper part of the superheater keeps bulging; it needs to be repaired every year. What is the reason for this? The wall facing straight on is in poor condition; one side of it is bulging as well, while the other side is in better shape.
Reply #22017-05-28
Check if there is any drift
Reply #32017-06-01
These are issues related to design and installation quality; in the design, heavy furnace walls require load-relief layers, interconnecting layers, and expansion joints – without these, problems will arise. Problems also occur when the installation is not carried out in accordance with the design
Reply #42017-06-01
Check the outer shielding plate of the tail flue; it’s caused by air leakage. We’ve experienced this problem before, so we hope it can be resolved as soon as possible
Reply #52017-06-01
Check the outer shielding plate of the tail flue; it’s caused by air leakage. We’ve experienced this problem before, so we hope it can be resolved as soon as possible
Reply #62017-06-08
This phenomenon occurs on all three sides of the furnace wall, to varying degrees; it can’t be that there is air leakage on all of them, right?
Reply #72017-06-08
There is a gap between the outer protective panel and the bricks; when air leaks in, it flows through any cracks or gaps in the bricks, and it’s not clear in which direction it goes
Reply #82017-06-16
Such problems occur when there are issues with deflection, expansion joints during construction, and associated fixations.
Reply #92017-09-13
Specializing in the spraying of fluidized bed boilers; high carbon content in fly ash, preventing the boiler from reaching operating load. Engineer Liu 13002709449

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.