HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Steam hardness and conductivity exceed limits

2017-06-08View Original

Thread Content

We have boilers with a capacity of 55T, operating in a two-in-use-one-backup configuration. When switching boilers, the steam produced by the newly started boiler has excessive hardness and conductivity levels; it takes 4 to 8 hours for these parameters to reach acceptable levels. What is the cause of this?
Reply #22017-06-08
I would like to know what parameters are monitored for steam What method is used for detection?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.