HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Please ask

2017-09-27View Original

Thread Content

What is the structure of an exhaust gas absorption tower between plate frames?
Reply #22017-09-28
The plate and frame filter is generally used as the final step in the treatment process; the sludge is fed into this filter, while the waste gas from earlier stages must be neutralized in a neutralization tank first. An exhaust gas inlet is located at the top of the neutralization tank, leading to the exhaust gas absorption tower.
Reply #32017-09-28
Thank you, :handshake. Could you draw for me a simple schematic diagram of the waste gas absorption tower between the plates and frames, something that is easy to understand? Thank you.
Reply #42017-09-28
{:1_90:}Correct!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.