HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Pipes and containers made of stainless steel or alloy steel must be welded with argon filled on the back side

2018-04-14View Original

Thread Content

Tungsten inert gas welding is a welding technique that builds on the principles of conventional arc welding; it uses argon gas to protect the metal filler material. High current is applied to melt the filler material into a liquid state on the base material being welded, thereby creating a molten pool that allows for metallurgical bonding between the metal to be welded and the filler material. By continuously supplying argon gas during the high-temperature welding process, the filler material is kept away from oxygen in the air, which prevents its oxidation.
Reply #22018-04-14
Welding must still be carried out in accordance with the requirements of the process flow card.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.