HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How to add desiccant to the storage tanks at methanol filling stations.

2019-06-27View Original

Thread Content

The \"Code for the Construction of Methanol Fuel Filling Stations for Vehicles\" requires that a dryer be installed between the venting main pipe interface of the methanol storage tank and the breather valve, as well as before the interface where the gas-phase recovery system returns to the storage tank; this dryer should contain at least 10 kilograms of color-changing silica gel or another desiccant. I would like to ask whether 10 kg of desiccant is required for each port? What does the ventilation main refer to? Do mobile methanol filling stations also need to meet this requirement? I earnestly implore the expert to reply
Reply #22020-01-01
Methanol filling station: Installed on the vent pipe of the fuel tank; it is essential, as recommended by experts.
Reply #32020-01-03
In what form should it be installed? Are there any requirements for this?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.