HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Static equipment

2018-08-18View Original

Thread Content

What key points should supervisors pay attention to during the construction of static equipment?
Reply #22018-08-19
First, after the static equipment arrives at the site, a visual inspection is carried out to check the welds, roundness, and various specifications. Then, before installation, the foundation must be inspected for its dimensions, levelness, the location of the anchor bolt holes, and depth. Finally, during installation, check the equipment’s shims, the orientation of the pipe openings, the verticality of the equipment, and so on. There are corresponding standards for reference.
Reply #32018-08-19
Thank you to the BOSS for the guidance :)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.