How should the values for pore bridges in TⅠ and I tube bundles be determined in GB/T151-2026, and how should the technical requirements be specified?

2026-04-29View Original

Thread Content

After drilling the tube sheet, the width of allowable pore bridges must be ≥5.74 mm for ≥96% of the holes; the minimum allowable pore bridge width (for ≤4% of the holes) is 4.05 mm. How should this technical requirement be written according to the new standards for tubes TⅠ and Ⅰ?
Reply #22026-04-29
*Article number for the requirements regarding the classification of tube sheet hole bridge widths and allowable tolerances: 9.4.5 (2014 edition: 8.4.5) *Changes made: The specifications for the classification of tube sheet hole bridge widths and allowable tolerances have been revised; no specific values are given for TI and I grade hole bridge widths, only the allowable tolerances are specified; The allowable and minimum bridge width for grade II steel tube bundles is determined using formulas or tables ; Non-ferrous metals of Grade II are controlled according to the deviations of Grade I.
Reply #32026-04-29
The standard was released in a hurry; wait for further updates. However, the new standard has not yet been implemented; we are still using the old one for now
Reply #42026-05-07
I don’t yet have time to review the new standards. Based on the information provided by the original poster, under the new version (assuming heat exchange tubes with a diameter of 25, a tube center distance of 32, and a nominal width of the hole bridges of 7 mm), it should be stated that the allowable deviation for the width of the hole bridges is ±0.4/±0.6. It’s completely different from the previous version
Reply #52026-05-08
That’s what we discussed as well, but well, we still don’t know how to write it in an authoritative manner~~~
Reply #62026-05-09
For heat exchange tubes of diameter 25, the tube hole diameter varies depending on the grade, and is slightly larger than 25; the nominal hole bridge width must be calculated by referring to the table in section 7.5.1
Reply #72026-05-09
Calculate the nominal span width of the bridge; the notation ±0.4/±0.6 is correct
Reply #82026-05-15
I’m asking how to write it, not how to calculate the positive and negative deviations.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.