HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Regarding the issue of the natural gas nozzle insertion depth in vertical calcination kilns

2017-07-13View Original

Thread Content

Hello everyone, I have a vertical calcination furnace. The calcination zone has two rows of 6 natural gas nozzles each, on the top and bottom. The thickness of my insulation layer is 0.9 meters. Now here’s the problem: during maintenance a few days ago, I found that the length of those natural gas nozzles was only 0.4 meters; in other words, there is still a gap of 0.5 meters before the nozzles can reach the inner wall of the furnace. How can I calculate an appropriate distance?
Reply #22017-07-14
This distance was determined by the design institute when it carried out the design. The specific method is for the design institute to use simulation software, based on the furnace type as well as the number and position of the nozzles, to simulate and determine the insertion distance of the burner nozzles at the optimal combustion condition.
Reply #32017-07-14
This distance was determined by the design institute when it carried out the design. The specific method is for the design institute to use simulation software, based on the furnace type as well as the number and position of the nozzles, to simulate and determine the insertion distance of the burner nozzles at the optimal combustion condition.
Reply #42017-07-14
This distance was determined by the design institute when it carried out the design. The specific method is for the design institute to use simulation software, based on the furnace type as well as the number and position of the nozzles, to simulate and determine the insertion distance of the burner nozzles at the optimal combustion condition.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.