HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Re-inspection of boiler raw materials upon arrival at the factory

2018-09-27View Original

Thread Content

I am looking for the re-inspection standards for boiler raw materials upon arrival at the factory. Previously, JB3375 was used; however, after checking the relevant regulations in 16507 and 16508, this standard is not mentioned there; Who knows what criteria should be used?
Reply #22018-09-27
It’s right to adopt standards. The relevant requirements (such as TSG G0001) also need to be met.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.