Thread Content
The Licensing Rules for Special Equipment Production and Filling Units (draft for review) contain many changes compared to the previous draft for public comments.
Where can I download the full text? No information was found on the website of the State Administration for Market Regulation
Rules for Licensing Special Equipment Production and Filling Units (Draft for Review)
Thank you for sharing. It seems that both the original poster’s and the moderator’s avatars have reverted to their previous versions: lol Am I really that observant?
Thank you for sharing; this has a significant impact on the special equipment industry
This is the review version; I’m not sure what major changes there will be in the final version.
The implementation date was incorrectly written as June 1, 2016: lol
What’s going on here? I wouldn’t have noticed it if you hadn’t told me!
It seems there aren’t many changes compared to the previous version
The name has changed; The valid period of the license has been changed back to 4 years, and more provisions in the safety technical specifications have been repealed ; Those applying for the “Self-declaration commitment to reissue a certificate” as specified in rule 3.6.3.2 must have completed 5 pressure vessel design projects at the certification level required during the permit validity period. The total number of full-time designers at the rule design unit should generally be no less than 10, of whom at least 2 should be responsible for design review and approval ; The total number of full-time design personnel in a Class D pressure vessel manufacturing unit should generally be no less than 5, with no less than 2 approval officers ; The change rate of design approvers at corresponding levels shall not exceed 30%. Wait
The change rate of design approvers at corresponding levels should not exceed 30%, which does not quite fit the national conditions. For many companies, it’s already good if 30% of their operations remain unchanged over a period of 4 years.