HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Are tank-like structures made of pipes and pipe caps at construction sites considered pressure vessels?

2019-12-09View Original

Thread Content

At the construction site of the system, pipe caps are welded to both ends of a DN400 pipe that is over one meter in length; the pipe is equipped with process inlets and outlets (DN150). The operating pressure does not exceed 1.0 MPa, and the process medium flowing within the pipe is liquefied gas (non-toxic and non-explosive). Does such a pipe assembly qualify as a pressure pipeline or as a pressure vessel? As shown in the figure
Reply #22019-12-09
You yourself said it – call them pipe components, pipe assemblies, or pipe fittings. The question is: What exactly happened at the scene, for which you are asking?
Reply #32019-12-09
It should be a pressure vessel, just an incomplete one. Over time, after these changes, various problems will arise; at the very least, the flow rate will change, which in turn can lead to issues such as corrosion.
Reply #42019-12-09
Those pressure pipelines that are welded on-site from steel pipes and fittings are regulated as pressure pipelines, while those that are welded by the manufacturer and then transported to the site for installation are generally regulated as pressure vessels. This is how the manifolds at gas transmission stations for long-distance pipelines are constructed (some also call them gathering pipes).
Reply #52019-12-09
Whether it is a pressure pipeline or a pressure vessel, it seems that there is no design documentation in the original question; it is likely related to compliance issues
Reply #62019-12-09
It is a system modification that requires the addition of such a pipe; the construction party was entrusted with the design and installation work. The issue is that the construction party is concerned that the special inspection agency might classify it as a pressure vessel
Reply #72019-12-09
What grade is the pipeline originally? Are there any blueprints for the renovation? Does the construction company have the necessary design qualifications? In chemical industrial zones across the country, the management of such special equipment is mostly carried out through on-site inspections and supervision
Reply #82019-12-09
If it wasn’t a pressure pipeline in the first place, then it isn’t one now either
Reply #92019-12-09
Nothing actually happened on site; during the design phase, it was merely due to concerns on the part of the construction party. The current approach is to ask the container manufacturer to expedite the production of the containers. The reason for seeking advice is that similar problems exist in other projects that are also being carried out
Reply #102019-12-09
The whole story has not been clarified to this day. \ud83d\ude37
Reply #112019-12-09
GC2 grade, refrigeration pipes; there are drawings available for the modification. Initially, it was planned to use pipes, but the container was modified after the contractor raised the suggestion; the construction party has design qualifications

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.