Do high-pressure threaded lock ring heat exchangers require leak testing every time they are shut down?

2020-11-20View Original

Thread Content

In 2017, the high-pressure heat exchangers produced by our company did not meet quality standards; leaks were detected in these heat exchangers (in both the feedstock and reaction effluents), which led to an emergency shutdown. Over the following years, during each shutdown for maintenance, leaks were checked, and each time leaks were found in those heat exchangers – the problem was mainly related to the gaskets in the tube and shell sections. Furthermore, obvious indentations were found at the gasket locations in the tube and shell side gaskets. Dear teachers, does your factory also conduct leak tests every time it stops operating?
Reply #22020-12-24
I haven’t encountered it; could it be due to a large temperature difference, or too rapid shutdown and cooling?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.