How are the hydrostatic test values determined in a boiler assembly plant?

2022-03-19View Original

Thread Content

This post was last edited by qqsbig001 on 2022-3-19 at 16:25. The boiler is shipped in separate components, and hydraulic testing must be conducted on each component before shipment. According to the standards, for the drum in the component type, the water pressure is 1.25 times the normal value, with a holding time of 20 minutes; for other elements such as pipes, the pressure is 1.5 times the normal value, with a holding time measured in seconds or 5 minutes. So, how should the hydrostatic test values be determined for the assemblies of the upper and lower drum sections and the convection tubes (including the membrane wall)?
Reply #22022-03-20
Refer to the tests on the compressed side, or consult the manufacturer for reference.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.