General procedures for pigging and pressure testing before the commissioning of oil and gas pipeline projects

2022-05-20View Original

Thread Content

Hydraulic testing procedure for oil pipelines: cleaning the pipe section → measuring the diameter of the pipe section → filling the pipe section with water → increasing pressure in the pipe section → maintaining constant pressure → releasing pressure and draining water from the pipe section → flushing water from the pipe section → joining the pipe sections together → cleaning and measuring the diameter of the pipe sections between stations → inflating the pipe sections between stations → sealing the pipe sections between stations. Hydraulic testing procedure for gas pipelines: cleaning the pipe section → measuring the diameter of the pipe section → filling the pipe section with water → increasing pressure in the pipe section → maintaining pressure → releasing pressure and draining water from the pipe section → flushing water from the pipe section → joining the pipe sections together → flushing water from the inter-station pipe sections → measuring the diameter of the inter-station pipe sections → drying the inter-station pipe sections → inflating the inter-station pipe sections → sealing the inter-station pipe sections. Pneumatic testing procedure for oil pipelines: cleaning the pipe section → measuring the diameter of the pipe section → inflating and pressurizing the pipe section → stabilizing the pressure in the pipe section → releasing pressure and venting air from the pipe section → joining the pipe sections together → cleaning and measuring the diameter of the inter-station pipe sections → inflating the inter-station pipe sections → sealing the inter-station pipe sections. Pneumatic testing procedure for gas pipelines: cleaning the pipe segment → measuring the diameter of the pipe segment → filling the pipe segment with gas and increasing pressure → stabilizing the pressure in the pipe segment → releasing pressure and venting gas from the pipe segment → joining the pipe segments together → cleaning and measuring the diameter of the inter-station pipe segments → filling the inter-station pipe segments with gas → sealing the inter-station pipe segments.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.