If the inspection is carried out by the boiler inspection authority for floating-head heat exchangers, is it necessary to conduct the three pressure tests on-site?

2022-06-14View Original

Thread Content

If the inspection is carried out by the boiler inspection authority for floating-head heat exchangers, is it necessary to conduct the three pressure tests on-site? Are there any other more convenient ways to provide testimony?
Reply #22022-06-15
It depends on your agreement with the special inspector Such as videos, pictures, etc
Reply #32022-06-25
Essential to read for pipe fittings; the other two are generally not required on-site

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.