Thread Content
Hello, Sea Friends! Construction drawings (blueprints) for building projects generally need to be reviewed by a professional drawing review agency and stamped with an approval mark before they can be put into use. Are the construction blueprints for pressure pipelines and equipment also required to be reviewed from a technical perspective? Please help resolve this doubt, thank you
Construction blueprints for pressure pipelines and equipment do not require third-party review; the entity responsible for preparing the drawings is accountable for that. In some projects, the signature of a supervision company is required, but it is not a mandatory requirement;
This post was last edited by Chem-Design on 2022-9-19 at 14:36. The construction drawings for individual components need to be reviewed, and the same applies to pressure pipelines; The pressure pipeline blueprint must be prepared by a design institute with the appropriate design qualifications, stamped with the institute’s certification seal as well as the pressure pipeline-specific seal, and then submitted to a specialized inspection agency for approval ;
Drawing review and third-party audit are two different things
It is necessary to check the local requirements; in some areas, in addition to the individual construction drawings for structure, building services, plumbing, and heating, it is also required to review the construction drawings for electrical, automation control, process engineering, and piping systems. A certificate will be issued only after all these are approved;
Our company carries out high-pressure pipeline projects across the country, and we’ve never heard that pipeline drawings need to be reviewed by a third party. The reviews conducted by the client and the supervisor are not the same as those carried out by a third party in the construction field, you know
Most pressure pipelines do not require review by third-party agencies; they only need to be reviewed by the design and drafting office, go through the inspection procedures, and then be inspected by the Special Inspection Institute;
You can go and ask; just because you haven’t encountered it doesn’t mean it doesn’t exist. I ran into it once, and I was quite surprised at the time;
I’m not sure which department or company you encountered it with
Thank you all for your responses. On the current pipeline construction drawings, there is a special red ellipse stamp issued by the design team, which includes information such as the design qualification and the name of the design agency. The architecture project bears the approval stamp from the local housing and construction authority